Custom Designed Kitchen Montreal
With the guidance of Rêvecuisine, let’s make your dream kitchen come true!
We have been serving clients in Laval, Montreal and surrounding areas since 2013. Contact us for a free consultation and design your dream bathroom or kitchen today!
STEP 1
Kitchen Style
Choose your favorite kitchen style:
*We have more than 40 different styles of cabinet
for your choice in our showroom
STEP 2
Dimension of kitchen
Guidance for measurement:
The best kitchen plans start with accurate measurements. Proper measurements and storage space planning help provide ease in the ordering, installation, and functionality of your kitchen cabinets.
Following below step-by-step tips on how to measure
for your kitchen cabinets:
- Start measuring in inches (“) from the corner shown in the drawing.
- Measure the total length of all walls from corner to corner.
- Indicate the location and sizes of the doors and windows. Include individual corner to window/door outer frame dimensions.
- Confirm the room height and location of the drop ceiling and bulkheads.
- Indicate appliance locations and sizes on the chart provided with a different types of kitchen layout.
Layout of Kitchen:
If you still have problem for measurement of your kitchen: call us via 450-682-8868
STEP 3
Free Consultation and Quotation
Three ways to get your free consultation and quick quotation
- Book an appointment to visit our showroom:
- On line consultation: please provide your contact details, our specialist will contact you within two business days.
- If you would prefer to call us for an appointment, please dial 450-682-8868.
STEP 4
Design & Contract
Work out of design of your kitchen & sign of contract.
If you are satisfied with our quotation, come to our showroom. Our specialist will show you the 3D design of your kitchen and finalize the contract.
If any complementary information is needed, our specialist will go to your home to take measurements and complete the data collection.
STEP 5
Delivery & Assembly & Installation
Preparation of materials: 3~4 weeks since the signature of contract. Check the available date for installation.